Challenge:

Convert an existing file room into an exam room within two months to meet a critical client deadline.

Solution:

Through a client approved tendering process, Edon engaged design and engineering consultants to prepare tender drawings and specifications. All work occurred in occupied space during normal business hours, except tasks requiring water or mechanical shutoffs were completed after hours to avoid client disruption. The Project Manager oversaw demolition, construction, millwork, electrical, plumbing, and mechanical work for safety, quality, and legislative control.

Before and After

Parking Lot Expansion

By Case Studies

Challenge:

Create more parking by expanding the current lot and building a retaining wall.

Solution:

Before the project commenced, Edon coordinated with multiple stakeholders to acquire land for the parking lot expansion. Once secured, a geotechnical investigation was performed to study the area, create the design, and secure the development permit. A construction contractor was engaged to build a concrete retaining wall and expand the parking area based on the approved design. Edon monitored the project from start to finish ensuring proper documentation and communication with all parties involved.

Before and After

Mouldy Wall Remediation

By Case Studies

Challenge:

Remediate and repair a mouldy wall on the inside of an emergency response facility within two months.

Solution:

Edon provided tender services to engage a general contractor for the supply and installation of materials and labour following the client’s tendering procedures. Throughout the course of the project Edon’s team undertook inspections and supervised the work ensuring compliance with scope, budget, and schedule. An occupational hygienist was also engaged to perform air quality tests and provide clearance.